Offer Type
Offered
Services
General Building
The SOLID infrastructure team has been busy helping clients submit planning applications and calculate the earthworks costs at the preliminary design stage. Flood Risk Assessments for developments located in Flood Zone 3 need to demonstrate that the proposed ground profile can provide at least the equivalent amount of flood storage as the existing ground profile. The volume comparison needs to be assessed on a level-for-level basis so that the drainage officer is confident that there will be no reduction in the capacity for floodwater from the existing ground profile.